Predict and optimize repair routes: Offshore logistics forecasting product expected to reduce NPT by 15%

Offshore logistics forecasting predicts and optimizes repair routes: 15% NPT decrease and 22% higher equipment utilization expected.

Challenge

A large National Oil Company (NOC) spent more than $300 million annually on offshore-related logistics. Logistics planning was performed manually based on limited information, resulting in inconsistent asset utilization rates and sub-optimal routes and vessel chartering. Supply chain decisions were reactive, primarily driven from asset events after they occurred. For example, a recent equipment failure required replacement components to be shipped from an overseas supplier due to lack of inventory from local suppliers. These inefficiencies were a key driver of sub-par financial performance at the rig level, where one unit reported more than 1,400 hours of non-productive time (NPT) in the year related to logistic delays.

Solution

Arundo’s data scientists worked with the company’s internal analytics team to build a machine-learning model to predict logistics needs based on equipment operational data combined with forward-looking drilling plans. This model was then deployed and operationalized within the Arundo platform. All within 120 days.

The solution was delivered in two stages:

  • Built a predictive model utilizing historical information to map and analyze key operating variables.
  • Integrate and deliver a holistic solution that allowed management to plan supply vessels based on demand.
  • Strategic: Recommending charter contracts (spot market vs. long term)
  • Tactical: How to load balance shipping fleet across departure points
  • Operational: Vessel selection and intelligent routing

Results

By using the Arundo suite, the custom predictive solution was built and deployed at the customer site within 120 days. Based on model accuracy and historical performance, the customer is expected to see an NPT decrease of 15% and an increase in equipment utilization of 22% in 2017.

Click here to learn more about ArundoEdge - the solution we implemented to reduce NPT and increase equipment utilization.

Where is your plant on the scale?

Thirty minutes with our team, and you'll know your plant's level, the constraint holding it there, and what Level +1 is worth to you.

Find your plant's level Book a level assessment