Increasing paste-ink throughput with predictive risk scoring

A weekly risk score that predicts which ink orders will need post-test adjustment, with about 90% accuracy, so planners schedule around them.

Challenge

Paste-ink production for banknotes and secure documents involved frequent post-test adjustments that consumed about 42% of workstation time, each averaging 300 minutes. The risk per order sat in fragmented data across more than ten systems and over a thousand materials.

Solution

Arundo implemented a site-configurable logistic-regression risk model inside a prototype planning tool, combining a produced-material risk term with the contributions of the consumed materials after filtering the top 200 candidates. Risk scores are generated weekly from order details before production and turned into prioritised planning recommendations.

Impact

About 90% accuracy overall at a 30% false-positive tolerance and about 70% on previously unseen materials; adjustment time turned into proactive scheduling.

Where is your plant on the scale?

Thirty minutes with our team, and you'll know your plant's level, the constraint holding it there, and what Level +1 is worth to you.

Find your plant's level Book a level assessment