Raw-mill liner wear forecasting and gearbox failure monitoring

A forecast of the day the mill's roller liners reach their wear limit, and a continuous gearbox health metric trained on the failure the plant had already lived through.

Challenge

A cement plant's vertical roller mill could not run a full year on one set of roller liners, so the liners were rotated every six months at the cost of over a week of lost operation, sometimes at peak demand. The mill gearbox had failed critically twice, in 2014 and 2017, the second time through a twisted planet gear that ruptured an oil pipe and ran unlubricated.

Solution

Arundo's phase-1 analytics on the mill and gearbox data built a linear forecast of liner wear against manual measurements, to name the day a 70 mm wear level is reached and to show which operating conditions go with lower wear, and a principal-component health model of the gearbox sensors that reproduces the conditions leading up to the 2017 failure, with a recommendation to run it continuously and to test it against gearbox failures from other plants.

Impact

A regularly updated forecast of the liner rotation date, benchmarking of current wear against comparable periods, and a continuous gearbox health metric that can warn if the known failure mode returns.

Where is your plant on the scale?

Thirty minutes with our team, and you'll know your plant's level, the constraint holding it there, and what Level +1 is worth to you.

Find your plant's level Book a level assessment